Millwright
The line startsStation 0102030405 / 05

Capabilities
Five stations,one roof.
CNC machining, fabrication, assembly, inspection and packing on one floor, so a part never waits on a truck between steps.
- ±0.005 mmTightest tolerance
- 5 daysFirst parts
- 5Stations

Capabilities
Five stations,one roof.
CNC machining, fabrication, assembly, inspection and packing on one floor, so a part never waits on a truck between steps.
- ±0.005 mmTightest tolerance
- 5 daysFirst parts
- 5Stations

Capabilities
Five stations,one roof.
CNC machining, fabrication, assembly, inspection and packing on one floor, so a part never waits on a truck between steps.
- ±0.005 mmTightest tolerance
- 5 daysFirst parts
- 5Stations
The floor, station by station
From the first chipto the shipping label.
Each station is run by its own crew and booked on one schedule. Pick one to see its limits, the machines behind it and the work it has shipped.
01Station 01 / 05CNC machining
5-axis milling and turning in aluminium, steel and titanium.
Fourteen spindles run two shifts, from single prototypes to batches of 20,000. We program from your STEP file, prove the first part on the CMM and hold the process with in-cycle probing, so part 5,000 measures like part one.
What you get
- 5-axis and 3-axis milling
- Turning and mill-turn up to 420 mm
- Aluminium, steel, stainless, titanium and engineering plastics
- Anodising, plating and heat treatment managed for you
±0.005 mmParts in 5 daysOpen this capability
02Station 02 / 05Fabrication & welding
Laser-cut, formed and welded frames, housings and gear cases.
Sheet and plate are cut on a 6 kW fibre laser, formed on CNC press brakes and welded by coded welders or in the robot cell. Frames up to six metres leave the shop stress-relieved, machined on the datum faces and painted.
What you get
- Fibre laser cutting up to 25 mm
- Press brake forming to 4 m
- MIG, TIG and robotic welding
- Powder coat and wet paint in house
Up to 6 mCertified weldersOpen this capability
03Station 03 / 05Assembly lines
Sub-assemblies built, wired and tested on dedicated lines.
Give us the bill of materials and we build the unit: machined parts, bought-in components, wiring looms and fluid lines. Each line has its own work instructions, torque records and an end-of-line test that every unit must pass.
What you get
- Mechanical and electro-mechanical builds
- Wiring, pneumatics and hydraulics
- Functional test with a record per serial number
- Kanban or build-to-order supply
3 linesTested 100%Open this capability
04Station 04 / 05Inspection
Every batch measured against your drawing before it moves on.
The quality lab sits in the middle of the floor, at 20 °C. Three CMMs, a vision system and a surface tester check first articles and running batches, and the report travels with the parts.
What you get
- First article inspection reports
- CMM and vision measurement
- Material certificates and full traceability
- PPAP and AS9102 packs on request
CMM reportFirst article in 48 hOpen this capability
05Station 05 / 05Packing & shipping
Kitted, labelled and shipped to your line on your schedule.
Parts are cleaned, protected and packed the way your line wants to receive them: kits per build, returnable trays or export crates. We ship daily and hold agreed stock, so a change in your schedule does not stop your line.
What you get
- Line-side kits and returnable packaging
- Barcode and customer-specific labels
- Stock held against call-off orders
- Export crating and customs paperwork
99.2% on time34 countriesOpen this capability
The floor, station by station
From the first chipto the shipping label.
Each station is run by its own crew and booked on one schedule. Pick one to see its limits, the machines behind it and the work it has shipped.
01Station 01 / 05CNC machining
5-axis milling and turning in aluminium, steel and titanium.
Fourteen spindles run two shifts, from single prototypes to batches of 20,000. We program from your STEP file, prove the first part on the CMM and hold the process with in-cycle probing, so part 5,000 measures like part one.
What you get
- 5-axis and 3-axis milling
- Turning and mill-turn up to 420 mm
- Aluminium, steel, stainless, titanium and engineering plastics
- Anodising, plating and heat treatment managed for you
±0.005 mmParts in 5 daysOpen this capability
02Station 02 / 05Fabrication & welding
Laser-cut, formed and welded frames, housings and gear cases.
Sheet and plate are cut on a 6 kW fibre laser, formed on CNC press brakes and welded by coded welders or in the robot cell. Frames up to six metres leave the shop stress-relieved, machined on the datum faces and painted.
What you get
- Fibre laser cutting up to 25 mm
- Press brake forming to 4 m
- MIG, TIG and robotic welding
- Powder coat and wet paint in house
Up to 6 mCertified weldersOpen this capability
03Station 03 / 05Assembly lines
Sub-assemblies built, wired and tested on dedicated lines.
Give us the bill of materials and we build the unit: machined parts, bought-in components, wiring looms and fluid lines. Each line has its own work instructions, torque records and an end-of-line test that every unit must pass.
What you get
- Mechanical and electro-mechanical builds
- Wiring, pneumatics and hydraulics
- Functional test with a record per serial number
- Kanban or build-to-order supply
3 linesTested 100%Open this capability
04Station 04 / 05Inspection
Every batch measured against your drawing before it moves on.
The quality lab sits in the middle of the floor, at 20 °C. Three CMMs, a vision system and a surface tester check first articles and running batches, and the report travels with the parts.
What you get
- First article inspection reports
- CMM and vision measurement
- Material certificates and full traceability
- PPAP and AS9102 packs on request
CMM reportFirst article in 48 hOpen this capability
05Station 05 / 05Packing & shipping
Kitted, labelled and shipped to your line on your schedule.
Parts are cleaned, protected and packed the way your line wants to receive them: kits per build, returnable trays or export crates. We ship daily and hold agreed stock, so a change in your schedule does not stop your line.
What you get
- Line-side kits and returnable packaging
- Barcode and customer-specific labels
- Stock held against call-off orders
- Export crating and customs paperwork
99.2% on time34 countriesOpen this capability
The floor, station by station
From the first chipto the shipping label.
Each station is run by its own crew and booked on one schedule. Pick one to see its limits, the machines behind it and the work it has shipped.
01Station 01 / 05CNC machining
5-axis milling and turning in aluminium, steel and titanium.
Fourteen spindles run two shifts, from single prototypes to batches of 20,000. We program from your STEP file, prove the first part on the CMM and hold the process with in-cycle probing, so part 5,000 measures like part one.
What you get
- 5-axis and 3-axis milling
- Turning and mill-turn up to 420 mm
- Aluminium, steel, stainless, titanium and engineering plastics
- Anodising, plating and heat treatment managed for you
±0.005 mmParts in 5 daysOpen this capability
02Station 02 / 05Fabrication & welding
Laser-cut, formed and welded frames, housings and gear cases.
Sheet and plate are cut on a 6 kW fibre laser, formed on CNC press brakes and welded by coded welders or in the robot cell. Frames up to six metres leave the shop stress-relieved, machined on the datum faces and painted.
What you get
- Fibre laser cutting up to 25 mm
- Press brake forming to 4 m
- MIG, TIG and robotic welding
- Powder coat and wet paint in house
Up to 6 mCertified weldersOpen this capability
03Station 03 / 05Assembly lines
Sub-assemblies built, wired and tested on dedicated lines.
Give us the bill of materials and we build the unit: machined parts, bought-in components, wiring looms and fluid lines. Each line has its own work instructions, torque records and an end-of-line test that every unit must pass.
What you get
- Mechanical and electro-mechanical builds
- Wiring, pneumatics and hydraulics
- Functional test with a record per serial number
- Kanban or build-to-order supply
3 linesTested 100%Open this capability
04Station 04 / 05Inspection
Every batch measured against your drawing before it moves on.
The quality lab sits in the middle of the floor, at 20 °C. Three CMMs, a vision system and a surface tester check first articles and running batches, and the report travels with the parts.
What you get
- First article inspection reports
- CMM and vision measurement
- Material certificates and full traceability
- PPAP and AS9102 packs on request
CMM reportFirst article in 48 hOpen this capability
05Station 05 / 05Packing & shipping
Kitted, labelled and shipped to your line on your schedule.
Parts are cleaned, protected and packed the way your line wants to receive them: kits per build, returnable trays or export crates. We ship daily and hold agreed stock, so a change in your schedule does not stop your line.
What you get
- Line-side kits and returnable packaging
- Barcode and customer-specific labels
- Stock held against call-off orders
- Export crating and customs paperwork
99.2% on time34 countriesOpen this capability
How an order runs
From drawing to dock.
Five steps on one schedule. You see the ship date on the day the order is confirmed, and you hear from us the day anything moves.
See the full process
01Day 0Step 01 / 05Drawing in
Send a STEP file or a PDF. An engineer reads it the same day and flags anything that would add cost or time.
02Day 1Step 02 / 05Quote and plan
Within 24 hours you have a fixed price, a ship date and the plan we will build to. Nothing starts until you approve it.
03Day 3Step 03 / 05First article
The first part is made, measured against every dimension on the drawing and signed off before the batch runs.
04Day 4Step 04 / 05Production
Machined, welded and assembled under one roof, with a check at every station and a record for every batch.
05Day 5Step 05 / 05On your dock
Packed to your spec, labelled for your line and shipped with its inspection report and certificates.
How an order runs
From drawing to dock.
Five steps on one schedule. You see the ship date on the day the order is confirmed, and you hear from us the day anything moves.
See the full process
01Day 0Step 01 / 05Drawing in
Send a STEP file or a PDF. An engineer reads it the same day and flags anything that would add cost or time.
02Day 1Step 02 / 05Quote and plan
Within 24 hours you have a fixed price, a ship date and the plan we will build to. Nothing starts until you approve it.
03Day 3Step 03 / 05First article
The first part is made, measured against every dimension on the drawing and signed off before the batch runs.
04Day 4Step 04 / 05Production
Machined, welded and assembled under one roof, with a check at every station and a record for every batch.
05Day 5Step 05 / 05On your dock
Packed to your spec, labelled for your line and shipped with its inspection report and certificates.
How an order runs
From drawing to dock.
Five steps on one schedule. You see the ship date on the day the order is confirmed, and you hear from us the day anything moves.
See the full process
01Day 0Step 01 / 05Drawing in
Send a STEP file or a PDF. An engineer reads it the same day and flags anything that would add cost or time.
02Day 1Step 02 / 05Quote and plan
Within 24 hours you have a fixed price, a ship date and the plan we will build to. Nothing starts until you approve it.
03Day 3Step 03 / 05First article
The first part is made, measured against every dimension on the drawing and signed off before the batch runs.
04Day 4Step 04 / 05Production
Machined, welded and assembled under one roof, with a check at every station and a record for every batch.
05Day 5Step 05 / 05On your dock
Packed to your spec, labelled for your line and shipped with its inspection report and certificates.

Request a quote
Send the drawing.Get a quote in 24 h.
Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.
- Quote in 24 h
- NDA before files
- No minimum order

Request a quote
Send the drawing.Get a quote in 24 h.
Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.
- Quote in 24 h
- NDA before files
- No minimum order

Request a quote
Send the drawing.Get a quote in 24 h.
Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.
- Quote in 24 h
- NDA before files
- No minimum order