Skip to content
Skip to content
Skip to content
An inspector beside the measuring machine in the glass-walled lab

Quality

Every batch ships with the numbers that prove it: a first-article report, the material certificate and the route it took across the floor.

  • ISO 9001
  • AS9100D
  • IATF 16949
  • ITAR registered
An inspector beside the measuring machine in the glass-walled lab

Quality

Every batch ships with the numbers that prove it: a first-article report, the material certificate and the route it took across the floor.

  • ISO 9001
  • AS9100D
  • IATF 16949
  • ITAR registered
An inspector beside the measuring machine in the glass-walled lab

Quality

Every batch ships with the numbers that prove it: a first-article report, the material certificate and the route it took across the floor.

  • ISO 9001
  • AS9100D
  • IATF 16949
  • ITAR registered

Inspection

Measured, not promised.

Every part leaves with its numbers. Touch a pin to read what the CMM measured on this housing, feature by feature.

A measuring probe touches the bore of a machined aluminium housing
Fig. 01 · Gearbox housing on the CMM

Inspection

Measured, not promised.

Every part leaves with its numbers. Touch a pin to read what the CMM measured on this housing, feature by feature.

A measuring probe touches the bore of a machined aluminium housing
Fig. 01 · Gearbox housing on the CMM

Inspection

Measured, not promised.

Every part leaves with its numbers. Touch a pin to read what the CMM measured on this housing, feature by feature.

A measuring probe touches the bore of a machined aluminium housing
Fig. 01 · Gearbox housing on the CMM

Certifications

A certificate is only useful if you know which part of the work it stands behind. In plain words:

  • ISO 9001

    Quality management

    How every order runs: contract review, document control, calibration, corrective action. Audited once a year by an outside body.

    The whole plant
  • AS9100D

    Aerospace

    Adds configuration control, first article inspection to AS9102 and traceability from the bar to the serial number.

    Machining + inspection
  • IATF 16949

    Automotive

    Adds PPAP, control plans, capability studies and run-at-rate for parts in series supply.

    Fabrication + assembly
  • ITAR registered

    Export control

    Controlled drawings stay on a separate server and controlled parts in a marked cell, handled by cleared staff only.

    On request
Gloved hands hold a small titanium part over a tray of them
Final inspection · CMM room at 20 °C

The inspection route

Every part number follows the same route. Nothing skips a station because the schedule is tight.

  1. Before the run

    First article

    The first part off the machine is measured on every feature of the drawing. The run does not start until the report is signed.

  2. During the run

    In-process

    Operators probe the key features in the cycle and gauge them at the machine at a set interval. A drift is corrected before it becomes scrap.

  3. After the run

    Final inspection

    A sample to the agreed plan, or every part where the drawing asks for it, goes to the CMM in a room held at 20 °C.

  4. With the shipment

    Report

    Measured values, gauges used and the inspector's name are tied to the batch and packed with the parts. We keep a copy for ten years.

With every batch

You should not have to ask for paperwork. These come in the box, and as a PDF the day the parts leave.

MillwrightDoc 01 / 05

Certificate of conformity

Part
MW-2041 housing
Drawing rev
C
Quantity
240
Batch
26-0418
Result
Conforms
Released

Certifications

A certificate is only useful if you know which part of the work it stands behind. In plain words:

  • ISO 9001

    Quality management

    How every order runs: contract review, document control, calibration, corrective action. Audited once a year by an outside body.

    The whole plant
  • AS9100D

    Aerospace

    Adds configuration control, first article inspection to AS9102 and traceability from the bar to the serial number.

    Machining + inspection
  • IATF 16949

    Automotive

    Adds PPAP, control plans, capability studies and run-at-rate for parts in series supply.

    Fabrication + assembly
  • ITAR registered

    Export control

    Controlled drawings stay on a separate server and controlled parts in a marked cell, handled by cleared staff only.

    On request
Gloved hands hold a small titanium part over a tray of them
Final inspection · CMM room at 20 °C

The inspection route

Every part number follows the same route. Nothing skips a station because the schedule is tight.

  1. Before the run

    First article

    The first part off the machine is measured on every feature of the drawing. The run does not start until the report is signed.

  2. During the run

    In-process

    Operators probe the key features in the cycle and gauge them at the machine at a set interval. A drift is corrected before it becomes scrap.

  3. After the run

    Final inspection

    A sample to the agreed plan, or every part where the drawing asks for it, goes to the CMM in a room held at 20 °C.

  4. With the shipment

    Report

    Measured values, gauges used and the inspector's name are tied to the batch and packed with the parts. We keep a copy for ten years.

With every batch

You should not have to ask for paperwork. These come in the box, and as a PDF the day the parts leave.

MillwrightDoc 01 / 05

Certificate of conformity

Part
MW-2041 housing
Drawing rev
C
Quantity
240
Batch
26-0418
Result
Conforms
Released

Certifications

A certificate is only useful if you know which part of the work it stands behind. In plain words:

  • ISO 9001

    Quality management

    How every order runs: contract review, document control, calibration, corrective action. Audited once a year by an outside body.

    The whole plant
  • AS9100D

    Aerospace

    Adds configuration control, first article inspection to AS9102 and traceability from the bar to the serial number.

    Machining + inspection
  • IATF 16949

    Automotive

    Adds PPAP, control plans, capability studies and run-at-rate for parts in series supply.

    Fabrication + assembly
  • ITAR registered

    Export control

    Controlled drawings stay on a separate server and controlled parts in a marked cell, handled by cleared staff only.

    On request
Gloved hands hold a small titanium part over a tray of them
Final inspection · CMM room at 20 °C

The inspection route

Every part number follows the same route. Nothing skips a station because the schedule is tight.

  1. Before the run

    First article

    The first part off the machine is measured on every feature of the drawing. The run does not start until the report is signed.

  2. During the run

    In-process

    Operators probe the key features in the cycle and gauge them at the machine at a set interval. A drift is corrected before it becomes scrap.

  3. After the run

    Final inspection

    A sample to the agreed plan, or every part where the drawing asks for it, goes to the CMM in a room held at 20 °C.

  4. With the shipment

    Report

    Measured values, gauges used and the inspector's name are tied to the batch and packed with the parts. We keep a copy for ten years.

With every batch

You should not have to ask for paperwork. These come in the box, and as a PDF the day the parts leave.

MillwrightDoc 01 / 05

Certificate of conformity

Part
MW-2041 housing
Drawing rev
C
Quantity
240
Batch
26-0418
Result
Conforms
Released

Questions

Straight answers on quoting, files, lead times and paperwork.

A machinist looks into an open CNC machining centre
  • Within 24 hours for machined and fabricated parts when we have a 3D model and a drawing. Assemblies with a long bill of materials take two to three working days.

Still have a question?

Send it with your drawing. An engineer replies inside one working day.

Ask an engineer

Questions

Straight answers on quoting, files, lead times and paperwork.

A machinist looks into an open CNC machining centre
  • Within 24 hours for machined and fabricated parts when we have a 3D model and a drawing. Assemblies with a long bill of materials take two to three working days.

Still have a question?

Send it with your drawing. An engineer replies inside one working day.

Ask an engineer

Questions

Straight answers on quoting, files, lead times and paperwork.

A machinist looks into an open CNC machining centre
  • Within 24 hours for machined and fabricated parts when we have a 3D model and a drawing. Assemblies with a long bill of materials take two to three working days.

Still have a question?

Send it with your drawing. An engineer replies inside one working day.

Ask an engineer
The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Create a free website with Framer, the website builder loved by startups, designers and agencies.