Overtime, air freight and a stopped line. The numbers behind on-time delivery.

30 Jul 2026 · 5 min read

Insight

Overtime, air freight and a stopped line. The numbers behind on-time delivery.

30 Jul 2026 · 5 min read

Insight

Overtime, air freight and a stopped line. The numbers behind on-time delivery.

30 Jul 2026 · 5 min read

A late part rarely shows up as a line in the accounts. It shows up as overtime, air freight and a customer who starts looking for a second source.

What a day costs

Take a line that builds twelve machines a month. One missing bracket stops a machine worth far more than the bracket. A week of delay can cost more than a year of that part's purchases.

Why parts are late

  • The order was placed against a lead time nobody checked
  • Material or coating was ordered after the purchase order arrived
  • A first article failed and there was no time to correct it

What on-time delivery really measures

Ask a supplier how they count it. Delivered on the day first promised is the only honest version. Ours was 99.2% last year, measured that way.

How to buy for delivery

Share the forecast, even when it is rough. Agree stock for the parts that would stop your line. Order the first article early, apart from the series batch.

The lowest price per part is not the lowest cost if the part is not there on the day.

What we do about it

Every order has a planned ship date on the day it is confirmed, and you can see it. If anything puts that date at risk, you hear from us that day, not on the due date.

Have a drawing on your desk?

Send it over. An engineer reads it and answers with a price and a date inside 24 hours.

Request a quote

A late part rarely shows up as a line in the accounts. It shows up as overtime, air freight and a customer who starts looking for a second source.

What a day costs

Take a line that builds twelve machines a month. One missing bracket stops a machine worth far more than the bracket. A week of delay can cost more than a year of that part's purchases.

Why parts are late

  • The order was placed against a lead time nobody checked
  • Material or coating was ordered after the purchase order arrived
  • A first article failed and there was no time to correct it

What on-time delivery really measures

Ask a supplier how they count it. Delivered on the day first promised is the only honest version. Ours was 99.2% last year, measured that way.

How to buy for delivery

Share the forecast, even when it is rough. Agree stock for the parts that would stop your line. Order the first article early, apart from the series batch.

The lowest price per part is not the lowest cost if the part is not there on the day.

What we do about it

Every order has a planned ship date on the day it is confirmed, and you can see it. If anything puts that date at risk, you hear from us that day, not on the due date.

Have a drawing on your desk?

Send it over. An engineer reads it and answers with a price and a date inside 24 hours.

Request a quote

A late part rarely shows up as a line in the accounts. It shows up as overtime, air freight and a customer who starts looking for a second source.

What a day costs

Take a line that builds twelve machines a month. One missing bracket stops a machine worth far more than the bracket. A week of delay can cost more than a year of that part's purchases.

Why parts are late

  • The order was placed against a lead time nobody checked
  • Material or coating was ordered after the purchase order arrived
  • A first article failed and there was no time to correct it

What on-time delivery really measures

Ask a supplier how they count it. Delivered on the day first promised is the only honest version. Ours was 99.2% last year, measured that way.

How to buy for delivery

Share the forecast, even when it is rough. Agree stock for the parts that would stop your line. Order the first article early, apart from the series batch.

The lowest price per part is not the lowest cost if the part is not there on the day.

What we do about it

Every order has a planned ship date on the day it is confirmed, and you can see it. If anything puts that date at risk, you hear from us that day, not on the due date.

Have a drawing on your desk?

Send it over. An engineer reads it and answers with a price and a date inside 24 hours.

Request a quote
The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Create a free website with Framer, the website builder loved by startups, designers and agencies.