The result · Project 01 / 06

−38% cycle time

The story

A six-axis arm link, re-fixtured to come off the machine in one setup.

Arden's arm link needed three setups and a manual deburr. We designed a dovetail fixture for the 5-axis cell, moved the bores into the same operation and cut the cycle from 47 to 29 minutes. Scrap fell from 4% to under 0.5%.

Client
Arden Robotics
Sector
Robotics & automation
Capability
CNC machining
Year
2026
A machinist looks into an open CNC machining centre

  1. Read the drawing

    An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.

    Day 0
  2. Fixture and programme

    We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.

    Week 1
  3. First article

    The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.

    Week 2
  4. Run, measure, ship

    Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.

    Every batch
In the customer's words
We sent a drawing on Monday and had inspected parts on Friday. After two years that is still how it works.
Daniel OkaforSupply chain lead · Arden Robotics

The result · Project 01 / 06

−38% cycle time

The story

A six-axis arm link, re-fixtured to come off the machine in one setup.

Arden's arm link needed three setups and a manual deburr. We designed a dovetail fixture for the 5-axis cell, moved the bores into the same operation and cut the cycle from 47 to 29 minutes. Scrap fell from 4% to under 0.5%.

Client
Arden Robotics
Sector
Robotics & automation
Capability
CNC machining
Year
2026
A machinist looks into an open CNC machining centre

  1. Read the drawing

    An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.

    Day 0
  2. Fixture and programme

    We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.

    Week 1
  3. First article

    The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.

    Week 2
  4. Run, measure, ship

    Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.

    Every batch
In the customer's words
We sent a drawing on Monday and had inspected parts on Friday. After two years that is still how it works.
Daniel OkaforSupply chain lead · Arden Robotics

The result · Project 01 / 06

−38% cycle time

The story

A six-axis arm link, re-fixtured to come off the machine in one setup.

Arden's arm link needed three setups and a manual deburr. We designed a dovetail fixture for the 5-axis cell, moved the bores into the same operation and cut the cycle from 47 to 29 minutes. Scrap fell from 4% to under 0.5%.

Client
Arden Robotics
Sector
Robotics & automation
Capability
CNC machining
Year
2026
A machinist looks into an open CNC machining centre

  1. Read the drawing

    An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.

    Day 0
  2. Fixture and programme

    We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.

    Week 1
  3. First article

    The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.

    Week 2
  4. Run, measure, ship

    Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.

    Every batch
In the customer's words
We sent a drawing on Monday and had inspected parts on Friday. After two years that is still how it works.
Daniel OkaforSupply chain lead · Arden Robotics
The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Create a free website with Framer, the website builder loved by startups, designers and agencies.