Millwright
The line startsStation 0102030405 / 05

Project
Arden Robotics
A six-axis arm link, re-fixtured to come off the machine in one setup.
- −38%cycle time
- CNC machining
- 2026

Project
Arden Robotics
A six-axis arm link, re-fixtured to come off the machine in one setup.
- −38%cycle time
- CNC machining
- 2026

Project
Arden Robotics
A six-axis arm link, re-fixtured to come off the machine in one setup.
- −38%cycle time
- CNC machining
- 2026
The result · Project 01 / 06
−38% cycle time−01234567890123456789%
cycle timeThe story
A six-axis arm link, re-fixtured to come off the machine in one setup.
Arden's arm link needed three setups and a manual deburr. We designed a dovetail fixture for the 5-axis cell, moved the bores into the same operation and cut the cycle from 47 to 29 minutes. Scrap fell from 4% to under 0.5%.
- Client
- Arden Robotics
- Sector
- Robotics & automation
- Capability
- CNC machining
- Year
- 2026

What wedid on the floor
- 01Day 0
Read the drawing
An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.
- 02Week 1
Fixture and programme
We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.
- 03Week 2
First article
The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.
- 04Every batch
Run, measure, ship
Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.
In the customer's words“We sent a drawing on Monday and had inspected parts on Friday. After two years that is still how it works.
The result · Project 01 / 06
−38% cycle time−01234567890123456789%
cycle timeThe story
A six-axis arm link, re-fixtured to come off the machine in one setup.
Arden's arm link needed three setups and a manual deburr. We designed a dovetail fixture for the 5-axis cell, moved the bores into the same operation and cut the cycle from 47 to 29 minutes. Scrap fell from 4% to under 0.5%.
- Client
- Arden Robotics
- Sector
- Robotics & automation
- Capability
- CNC machining
- Year
- 2026

What wedid on the floor
- 01Day 0
Read the drawing
An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.
- 02Week 1
Fixture and programme
We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.
- 03Week 2
First article
The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.
- 04Every batch
Run, measure, ship
Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.
In the customer's words“We sent a drawing on Monday and had inspected parts on Friday. After two years that is still how it works.
The result · Project 01 / 06
−38% cycle time−01234567890123456789%
cycle timeThe story
A six-axis arm link, re-fixtured to come off the machine in one setup.
Arden's arm link needed three setups and a manual deburr. We designed a dovetail fixture for the 5-axis cell, moved the bores into the same operation and cut the cycle from 47 to 29 minutes. Scrap fell from 4% to under 0.5%.
- Client
- Arden Robotics
- Sector
- Robotics & automation
- Capability
- CNC machining
- Year
- 2026

What wedid on the floor
- 01Day 0
Read the drawing
An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.
- 02Week 1
Fixture and programme
We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.
- 03Week 2
First article
The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.
- 04Every batch
Run, measure, ship
Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.
In the customer's words“We sent a drawing on Monday and had inspected parts on Friday. After two years that is still how it works.

Request a quote
Send the drawing.Get a quote in 24 h.
Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.
- Quote in 24 h
- NDA before files
- No minimum order

Request a quote
Send the drawing.Get a quote in 24 h.
Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.
- Quote in 24 h
- NDA before files
- No minimum order

Request a quote
Send the drawing.Get a quote in 24 h.
Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.
- Quote in 24 h
- NDA before files
- No minimum order
