Skip to content
Skip to content
Skip to content

Project

Line-side kits for a press builder, delivered to the hour.

  • 99.6%on-time kits
  • Packing & shipping
  • 2024

Project

Line-side kits for a press builder, delivered to the hour.

  • 99.6%on-time kits
  • Packing & shipping
  • 2024

Project

Line-side kits for a press builder, delivered to the hour.

  • 99.6%on-time kits
  • Packing & shipping
  • 2024

The result · Project 06 / 06

99.6% on-time kits

The story

Line-side kits for a press builder, delivered to the hour.

Brennan builds eleven presses a month from 340 of our part numbers. We hold stock against their forecast and ship one kit per press, in build order, so their fitters never wait for a part or count one.

Client
Brennan Press Systems
Sector
Industrial equipment
Capability
Packing & shipping
Year
2024
A machinist looks into an open CNC machining centre

  1. Read the drawing

    An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.

    Day 0
  2. Fixture and programme

    We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.

    Week 1
  3. First article

    The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.

    Week 2
  4. Run, measure, ship

    Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.

    Every batch

The result · Project 06 / 06

99.6% on-time kits

The story

Line-side kits for a press builder, delivered to the hour.

Brennan builds eleven presses a month from 340 of our part numbers. We hold stock against their forecast and ship one kit per press, in build order, so their fitters never wait for a part or count one.

Client
Brennan Press Systems
Sector
Industrial equipment
Capability
Packing & shipping
Year
2024
A machinist looks into an open CNC machining centre

  1. Read the drawing

    An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.

    Day 0
  2. Fixture and programme

    We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.

    Week 1
  3. First article

    The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.

    Week 2
  4. Run, measure, ship

    Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.

    Every batch

The result · Project 06 / 06

99.6% on-time kits

The story

Line-side kits for a press builder, delivered to the hour.

Brennan builds eleven presses a month from 340 of our part numbers. We hold stock against their forecast and ship one kit per press, in build order, so their fitters never wait for a part or count one.

Client
Brennan Press Systems
Sector
Industrial equipment
Capability
Packing & shipping
Year
2024
A machinist looks into an open CNC machining centre

  1. Read the drawing

    An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.

    Day 0
  2. Fixture and programme

    We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.

    Week 1
  3. First article

    The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.

    Week 2
  4. Run, measure, ship

    Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.

    Every batch
The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Create a free website with Framer, the website builder loved by startups, designers and agencies.