Valve skids built, piped and pressure-tested in under two weeks.

  • 9 daysorder to dock
  • Assembly lines
  • 2025

Project

Valve skids built, piped and pressure-tested in under two weeks.

  • 9 daysorder to dock
  • Assembly lines
  • 2025

Project

Valve skids built, piped and pressure-tested in under two weeks.

  • 9 daysorder to dock
  • Assembly lines
  • 2025

The result · Project 05 / 06

9 days order to dock

The story

Valve skids built, piped and pressure-tested in under two weeks.

Tidewater used to buy frames, blocks and pipework from four suppliers and assemble on site. We now fabricate, machine, assemble and test the complete skid, which took their lead time from seven weeks to nine working days.

Client
Tidewater Energy
Sector
Energy
Capability
Assembly lines
Year
2025
A machinist looks into an open CNC machining centre

  1. Read the drawing

    An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.

    Day 0
  2. Fixture and programme

    We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.

    Week 1
  3. First article

    The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.

    Week 2
  4. Run, measure, ship

    Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.

    Every batch
In the customer's words
One supplier, one purchase order, one skid that arrives tested. Our site team now installs instead of assembling.
Ryan CastellProject manager · Tidewater Energy

The result · Project 05 / 06

9 days order to dock

The story

Valve skids built, piped and pressure-tested in under two weeks.

Tidewater used to buy frames, blocks and pipework from four suppliers and assemble on site. We now fabricate, machine, assemble and test the complete skid, which took their lead time from seven weeks to nine working days.

Client
Tidewater Energy
Sector
Energy
Capability
Assembly lines
Year
2025
A machinist looks into an open CNC machining centre

  1. Read the drawing

    An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.

    Day 0
  2. Fixture and programme

    We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.

    Week 1
  3. First article

    The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.

    Week 2
  4. Run, measure, ship

    Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.

    Every batch
In the customer's words
One supplier, one purchase order, one skid that arrives tested. Our site team now installs instead of assembling.
Ryan CastellProject manager · Tidewater Energy

The result · Project 05 / 06

9 days order to dock

The story

Valve skids built, piped and pressure-tested in under two weeks.

Tidewater used to buy frames, blocks and pipework from four suppliers and assemble on site. We now fabricate, machine, assemble and test the complete skid, which took their lead time from seven weeks to nine working days.

Client
Tidewater Energy
Sector
Energy
Capability
Assembly lines
Year
2025
A machinist looks into an open CNC machining centre

  1. Read the drawing

    An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.

    Day 0
  2. Fixture and programme

    We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.

    Week 1
  3. First article

    The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.

    Week 2
  4. Run, measure, ship

    Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.

    Every batch
In the customer's words
One supplier, one purchase order, one skid that arrives tested. Our site team now installs instead of assembling.
Ryan CastellProject manager · Tidewater Energy
The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

The main aisle of the machine hall at night, one worker walking it

Request a quote

Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.

  • Quote in 24 h
  • NDA before files
  • No minimum order
Quote request0 / 3 filled
02Quantity
03Material

No account needed. You attach the drawing on the next page.

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Two technicians fit parts on the assembly lineFloor open Mon–Fri · 06:00–22:00

ISO 9001 · AS9100D · IATF 16949 · ITAR registered

Create a free website with Framer, the website builder loved by startups, designers and agencies.