Tidewater Energy
Valve skids built, piped and pressure-tested in under two weeks.
- 9 daysorder to dock
- Assembly lines
- 2025

Project
Tidewater Energy
Valve skids built, piped and pressure-tested in under two weeks.
- 9 daysorder to dock
- Assembly lines
- 2025

Project
Tidewater Energy
Valve skids built, piped and pressure-tested in under two weeks.
- 9 daysorder to dock
- Assembly lines
- 2025
The result · Project 05 / 06
9 days order to dock0123456789 days
order to dockThe story
Valve skids built, piped and pressure-tested in under two weeks.
Tidewater used to buy frames, blocks and pipework from four suppliers and assemble on site. We now fabricate, machine, assemble and test the complete skid, which took their lead time from seven weeks to nine working days.
- Client
- Tidewater Energy
- Sector
- Energy
- Capability
- Assembly lines
- Year
- 2025

What wedid on the floor
- 01Day 0
Read the drawing
An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.
- 02Week 1
Fixture and programme
We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.
- 03Week 2
First article
The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.
- 04Every batch
Run, measure, ship
Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.
In the customer's words“One supplier, one purchase order, one skid that arrives tested. Our site team now installs instead of assembling.
The result · Project 05 / 06
9 days order to dock0123456789 days
order to dockThe story
Valve skids built, piped and pressure-tested in under two weeks.
Tidewater used to buy frames, blocks and pipework from four suppliers and assemble on site. We now fabricate, machine, assemble and test the complete skid, which took their lead time from seven weeks to nine working days.
- Client
- Tidewater Energy
- Sector
- Energy
- Capability
- Assembly lines
- Year
- 2025

What wedid on the floor
- 01Day 0
Read the drawing
An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.
- 02Week 1
Fixture and programme
We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.
- 03Week 2
First article
The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.
- 04Every batch
Run, measure, ship
Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.
In the customer's words“One supplier, one purchase order, one skid that arrives tested. Our site team now installs instead of assembling.
The result · Project 05 / 06
9 days order to dock0123456789 days
order to dockThe story
Valve skids built, piped and pressure-tested in under two weeks.
Tidewater used to buy frames, blocks and pipework from four suppliers and assemble on site. We now fabricate, machine, assemble and test the complete skid, which took their lead time from seven weeks to nine working days.
- Client
- Tidewater Energy
- Sector
- Energy
- Capability
- Assembly lines
- Year
- 2025

What wedid on the floor
- 01Day 0
Read the drawing
An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.
- 02Week 1
Fixture and programme
We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.
- 03Week 2
First article
The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.
- 04Every batch
Run, measure, ship
Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.
In the customer's words“One supplier, one purchase order, one skid that arrives tested. Our site team now installs instead of assembling.

Request a quote
Send the drawing.Get a quote in 24 h.
Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.
- Quote in 24 h
- NDA before files
- No minimum order

Request a quote
Send the drawing.Get a quote in 24 h.
Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.
- Quote in 24 h
- NDA before files
- No minimum order

Request a quote
Send the drawing.Get a quote in 24 h.
Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.
- Quote in 24 h
- NDA before files
- No minimum order