Project
Voltline
From a welded prototype to series supply in fourteen weeks.
- 1,200battery trays a week
- Fabrication & welding
- 2025

Project
Voltline
From a welded prototype to series supply in fourteen weeks.
- 1,200battery trays a week
- Fabrication & welding
- 2025

Project
Voltline
From a welded prototype to series supply in fourteen weeks.
- 1,200battery trays a week
- Fabrication & welding
- 2025
The result · Project 03 / 06
1,200 battery trays a week0123456789,012345678901234567890123456789
battery trays a weekThe story
From a welded prototype to series supply in fourteen weeks.
Voltline came with a prototype tray welded by hand. We moved it to the robot cell, added a leak test at the end of the line and ramped from 40 to 1,200 trays a week, with PPAP approved at the first submission.
- Client
- Voltline
- Sector
- Automotive & EV
- Capability
- Fabrication & welding
- Year
- 2025

What wedid on the floor
- 01Day 0
Read the drawing
An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.
- 02Week 1
Fixture and programme
We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.
- 03Week 2
First article
The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.
- 04Every batch
Run, measure, ship
Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.
In the customer's words“They told us our weld design would distort before we had paid for anything. The change they suggested is in production today.
The result · Project 03 / 06
1,200 battery trays a week0123456789,012345678901234567890123456789
battery trays a weekThe story
From a welded prototype to series supply in fourteen weeks.
Voltline came with a prototype tray welded by hand. We moved it to the robot cell, added a leak test at the end of the line and ramped from 40 to 1,200 trays a week, with PPAP approved at the first submission.
- Client
- Voltline
- Sector
- Automotive & EV
- Capability
- Fabrication & welding
- Year
- 2025

What wedid on the floor
- 01Day 0
Read the drawing
An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.
- 02Week 1
Fixture and programme
We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.
- 03Week 2
First article
The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.
- 04Every batch
Run, measure, ship
Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.
In the customer's words“They told us our weld design would distort before we had paid for anything. The change they suggested is in production today.
The result · Project 03 / 06
1,200 battery trays a week0123456789,012345678901234567890123456789
battery trays a weekThe story
From a welded prototype to series supply in fourteen weeks.
Voltline came with a prototype tray welded by hand. We moved it to the robot cell, added a leak test at the end of the line and ramped from 40 to 1,200 trays a week, with PPAP approved at the first submission.
- Client
- Voltline
- Sector
- Automotive & EV
- Capability
- Fabrication & welding
- Year
- 2025

What wedid on the floor
- 01Day 0
Read the drawing
An engineer goes through every tolerance and datum with the customer's designer and marks what drives cost before a price is given.
- 02Week 1
Fixture and programme
We design the workholding, write the programme and simulate the cut, so the first part off the machine is already close.
- 03Week 2
First article
The first part is measured on every feature. The report goes to the customer and the run waits for their sign-off.
- 04Every batch
Run, measure, ship
Series parts are checked in process and at final inspection, then packed with the report that carries their serial numbers.
In the customer's words“They told us our weld design would distort before we had paid for anything. The change they suggested is in production today.

Request a quote
Send the drawing.Get a quote in 24 h.
Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.
- Quote in 24 h
- NDA before files
- No minimum order

Request a quote
Send the drawing.Get a quote in 24 h.
Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.
- Quote in 24 h
- NDA before files
- No minimum order

Request a quote
Send the drawing.Get a quote in 24 h.
Tell us the part, the quantity and the material. An engineer reads your drawing and comes back with a price, a lead time and anything that would make the part cheaper to make.
- Quote in 24 h
- NDA before files
- No minimum order